Groundwork Shelfie 4

Shelfie 4 Maple River

It might seem odd to be talking about ground work with a picture like the one above. The reality is that the structures above are ‘placed’ for the photograph, and the eye level viewpoint disguises this.

Maple River

This is the reality today. I’m fixing the final core ground structure in place using 5mm balsa wood to bring the majority of the ground levels to the underlay height.

Shelfie 4

In the right lighting conditions the layout is really beginning to ‘pop’, and with the ground work and foreground to be completed it’s really encouraging just to start playing with the potential that I think will come from it photographically.

Maple River Shelfie

Another day on the core ground work and a refresher of the wiring loom and control position and it’ll be down to the final touches and blocking in the fascia, and lighting rig. Four weeks left to complete!

This entry was posted in ak interactive, america, americana, Bachmann, baseboards, blog, Branch Line, Cameo, Cameo layout, canada, canadian national, canadian pacific, DC, DCC, dcc sound, exactrail, Exhibition, finescale, free-mo, heljan, HO, ho scale, hobbies, Hobby, Industrial, kadee, Layout, layout design, LED Lighting, light railway, man cave, maple river, model, Model Railroad, Model Railway, Modelling, n gauge, Narrow Gauge, O Gauge, o scale, OO, OO Gauge, peco, planning, railroad, railway, Rapido Trains, realism, saturday, scale, scale modelling, scenery, shelf layout, shelfie, shelfie4, tangent, toy train, TT Gauge, Uncategorized, woodland scenics. Bookmark the permalink.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.